• To ensure a uniform finish, use packs bearing the same batch number.
• To ensure correct product performance, never apply more than 150 microns wet-film thickness, as this may cause drying problems and blistering during solvent evaporation.
• On new cementitious substrates, allow the mortar to cure fully before application: 2 months for sand-cement mixes and 3 months for sand-cement-lime mixes. This is necessary to ensure good coating adhesion.
• Do not use RUBBER POOL COATING in combination with insulating materials other than those recommended in the Technical Data Sheet.
• On cement and fibre-cement surfaces, thin the first coat with 20% SL501 THINNER. Wait 24 hours before recoating. Where necessary, thin the product as described above according to the application method.